ZAX200 front idler excavator 9242965 Zaxis excavator

ZAX200
The primary function of a front idler excavator is to ensure seamless movement of the track links and prevent displacement. In addition, Idlers are designed to bear a certain amount of weight, which results in increased track link stiffness and reduced ground pressure. Positioned centrally, Idlers also provide support to the track link and guide both sides in tandem. Furthermore, the alignment between the idler and track roller is essential for improved orientation, with greater proximity between the two yielding optimal results.
Delivery: 
EXW,FOB,CIF
minimum order: 
2 pieces
Supply Ability: 
100pieces / Day
Country of Origin: 
Fujian,China
Stock Time: 
5Day
Quantity:
US $20.00 - US $200.00 / pieces
Contact Now

ZAX200 front idler excavator 9242965 Zaxis excavator ZAX200-3 ZAX240

The primary function of a front idler excavator is to ensure seamless movement of the track links and prevent displacement. In addition, front idler excavator is designed to bear a certain amount of weight, which results in increased track link stiffness and reduced ground pressure. Positioned centrally, front idler excavator also provide support to the track link and guide both sides in tandem. Furthermore, the alignment between the front idler excavator and track roller is essential for improved orientation, with greater proximity between the two yielding optimal results.
 
front idler excavator Manufacturer in China

FAQ

Q1: What are your Main Products ?
We are specialized in spare parts for excavator undercarriage and bucket parts, such as bolt and nut , bucket pins and bushes, track chain , track roller, track shoes, front idler excavator, track pin and bush,etc.If you need other excavator parts, we also can supply as your requirements.
 
Q2: How to ensure that every process's quality?
Every process will be checked by our quality inspection department which insures every product's quality. In the production, we will personally go to the factory to check the quality of front idler excavator.
 
Q3: Can you provide sample?
Sure, we accept front idler excavator sample order.
 
Q4:What is your Delivery Time?
Generally, we will arrange the front idler excavator within 5 days after your payment; if not in stock, stocking time is 10 days.
 
Q5: How do I pay?
You are required do the payment by T/T.If the delivery time more than 20 days you should pay 30% first for deposit.Besides,you need pay 100% before loading.